Sunday, September 29, 2013

A month in review - 9/7/13




The skylight had to come down.  This was one of the major causes of the water damage the building experience over the past couple of years.

The hole left by the skylight.

A door and sidelights were removed to expose a hallway that was once somebody's closet.

Back apartment living room.  

Dale has covered the entire roof with tarps in an attempt to stop the leaking.  And it's working!


These are the decorative pieces at the top of the building.  

Chimney that will eventually come down.



Somehow, I'm going to have to paint this.  It's a LONG way down!


No comments:

Post a Comment